Context 142 - November 2015

C O N T E X T 1 4 2 : N O V E M B E R 2 0 1 5 31 coordinated by Historic Environment Scotland (formerly Historic Scotland).APG has now installed the product in a 19th-century tenement flat,where it is being monitored. Improving the performance of windows is typically restricted to simplistic measures such as draught-proofing and double glazing, without regard to a myriad of associated conditions. Double windows, typical of many regions of mainland Europe, already exist in the 19th century building of the Budapest University ofTechnology and Economics, situated on the Danube riverbank. For teaching rooms in this building, EFFESUS has developed an advanced window system with in-built air supply valves and shading blinds, both connected to a building management system.The window development is a collaboration between the Hungarian architectural firm HorBer, the Norwegian University of Science and Technology (NTNU), DWEcoCo and Snekkeriet, a Norwegian joinery company.The building management system was developed and coordinated by the Italian partner RED Srl. The new double windows replace existing windows and are fitted with slim-profile, high-performance double- and triple-glazing units. Integrated into the 150mm-wide space between the inner and outer casements are motorised shading blinds. Special air supply valves are fitted into both the inner and outer window frames. Air pressure and temperature differences create a passive air flow. Outdoor air is drawn into the space in between the frames and pre-heated by the heat transfer through the window glass before entering the room, improving the window’s energy efficiency significantly. If the indoor carbon dioxide levels increase above a set threshold, the building management system activates a mechanical exhaust fan in the room. This, in turn, increases the pressure difference, thereby accelerating the air flow through the air supply valves in the window frames.This mix of passive and active ventilation improves the indoor air quality while minimising associated energy losses. The shading blinds integrated into the windows are managed by daylight sensors connected to the building management system to control solar glare, solar heat gain and the ambient lighting conditions. When the shading in the windows is lowered to prevent overheating due to solar gain, the building management system responds to information from illumination and occupancy sensors to activate the lighting. The system can be manually overridden, for example if a darkened room is required for presentations.The building management system also controls a motorised radiator valve which modulates the heat output in the roomtomaintain comfortable conditions. The three technological developments presented here are all being monitored in the case studies by RED, together with another Italian project partner the Institute of Atmospheric Sciences and Climate of the National Research Council. Evaluation results will be available in time for the completion of the project in the summer of 2016.The industry partners in the EFFESUS consortium are in the process of developing business models to exploit the new product developments. Set-up of building services in the test room of the Budapest case study before and after retrofit: the building management system is connected to the window blinds and air supply valves, radiator valves, the lighting and various sensors (Image: Historic Environment Scotland and RED) Replacement doublewindow systems, with air supply valves and integrated shading blinds linked to a building management system (Photo: NTNU) Far left: Integration of air supply valves and shading blinds into the double windows developed for the Budapest case study buildings (Image: NTNU) Carsten Hermann is a senior technical officer at Historic Environment Scotland. Dennis Rodwell, an architect-planner, is a consultant in cultural heritage and sustainable urban development.

RkJQdWJsaXNoZXIy MjgyMjA=