Context 181 - September 2024

30 CONTEXT 181 : SEPTEMBER 2024 were opened by Birmingham City Council’s housing department during Heritage Week, when the Birmingham Conservation Trust hosted a series of activities aided by the Prefab Museum. As one of the volunteers, I was blown away by the diversity of people visiting them (far more diverse than seen in most heritage sites), by the memories and stories people brought with them, by their utter fascination with them and by their appreciation for what they were. Guides demonstrated the ingenious systems of inbuilt furniture, sometimes serving dual rooms: a wardrobe in a bedroom and a cupboard in the hall, a recessed shelf in the kitchen over a shelf in the bathroom. Items of surviving lino, wallpaper, fireplaces, hearths, and even rent books and electricity dockets were pored over. I first saw the homes in 2014 when inspecting for Historic England and resisted a proposal for their demolition. They were gradually becoming at risk, with a number being vacant. A feasibility study, funded by Historic England in 2017, identified that the best use for them was to remain as housing for the council, with perhaps one or two made accessible as a museum for a trust and another as a potential Airbnb, capitalising on their potential retro appeal. No solution came forward, though, and the council embarked on planning for their renovation. It was always going to be challenging. The main issues were the corrugated asbestoscement exterior walls and roofs, and the failure of the concrete floors in various ways. It was considered important that the frames were not disassembled because of the high degree of loss that would entail. Instead, a solution was pursued to renew the floors and foundations while the frame stayed in place. Examples of this was renovation work done at Croome Court for the National Trust, underpinning concrete floors of temporary military buildings. Other parts of the structures at Wake Green Road included the steel tubular poles at the corners and at intervals, holding a frame to which the asbestos cement was attached. The windows had already been replaced with double-glazed units. Conservation of the units began on a pilot basis in 2023. A number of vacant units were worked on to test systems, the theory being that they could be available to people who would move into them when their own houses were being renovated. The interiors were stripped out, with original fittings put in storage; external walls were underpinned using resin injection; traditional concrete foundations were laid along the central spine walls; and new insulated concrete floors were cast. Drawings existed that were a good guide to some of the construction detailing. Puzzles Working on the repair of the asbestos-cement panels of the gable where ivy had grown in through the eaves, and preparing the elevation for filling and painting The stripped-back interior shows the original asbestoscement exterior cladding in place, the original steel tube frames at the corners and at intervals, and a new sub-floor. The original linings were timber sheeting with some minimal insulation between.

RkJQdWJsaXNoZXIy MjgyMjA=