28 C O N T E X T 1 4 2 : N O V E M B E R 2 0 1 5 The largest of the Tecton structures at DZG, the bear ravine was the most structurally ambitious design. Due to changes in animal husbandry best practice, the enclosure has lain empty for several years.The original design was created to enclose the bears in a ‘pit’ with an oval reinforced concrete wall all around it. A staircase at one side of the pit rises up to a walkway which provided a viewing gallery from which visitors could observe the bears from above. This also forms a partial roof for the pit. The structure includes a cantilevered viewing platform which extends out at a right angle below the viewing gallery. The structural engineering consultancy Stand Consulting Engineers was responsible for assessing the structural implications of the level of corrosion to the reinforcement, and developing a conservation strategy to repair the structure and reduce the risk of any further decay.The company’s investigations found that the steel reinforcements were superficially corroded and that the concrete surrounding the metal bars was insufficient to protect it. Indeed, while some bars were encased in one inch of concrete, which can be viewed as standard practice when the structures were built in 1936/7, in some areas there was as little as 5mm of concrete protecting the steelwork. The bear ravine viewing platform that cantilevers out beneath the main viewing gallery was particularly vulnerable and could be seen to bounce.The engineers needed to understand how the structure worked.With limited original architectural drawings available, the team used a cover meter to find out where the steel bars were within the structure. Having located the steel bars, the team was able to piece together how the platform had been constructed. The parapet is a concrete beam that ties the walkway back to the main structure. As the steelwork had evidently slumped during or after construction, the structural engineers initially feared that there would be no alternative to taking out the parapet and replacing it. However, adopting a first-principles approach to conservation and structural repairs, a strategy was agreed to focus on maintaining as much of the original structure as possible, and to maintain the visual appearance by employing contemporary materials and techniques to replace the remainder, rather than rebuilding significant sections with like-for-like materials. Part of the rationale behind this approach was the desire to avoid altering the outline of the structure by adding bulk, which would have been necessary to achieve the required structural integrity using original materials. The use of original materials would also have added weight to some areas of the structure.Without a complete picture of how the bear ravine was originally constructed, it was unknown how much impact additional weight could have on the building as a whole. The repairs were carried out by removing the concrete surrounding the corroded steel bars. Where these had buckled, they were knocked back into shape before being fortified with a galvanising coating. For the parapet’s concrete deck, loose material was removed and a 2mm layer of lightweight, high-strength carbon fibre bonding used to enhance the stiffness of the structure and reduce the amount of bounce. With the structural repairs completed, attention was turned to preserving the structures by adding a waterproofing membrane to protect them from water ingress. The original construction had not included any kind of waterproofing. Once again, the team and English Heritage accepted the use of contemporary materials.The specification criteria included selecting a waterproofing material that would not alter the profile of the structures and would terminate exactly as required. The chosen system had to have minimal visual impact as the location of several of the structures towards the bottom of the hillside means that the roofs are overlooked at various parts of the zoo. The curved nature of the entrance canopy structure also demanded that a tough, elastomeric and durable waterproofing system was chosen so that there would be no risk of cracks from structural movement, thermal changes or ultra-violet light.The troughs of the horizontal ‘s’ shapes are prone to standing water, so the waterproofing system had to be suitable for these conditions, with no vulnerable laps, seams or joints that could lead to isolated water ingress. Kemper System’s Kemperol 2K-PURwas selected for the waterproofing.This cold liquid-applied, solvent-free waterproofing membrane combines a liquid resin with a flexible reinforcement fleece, applied in a single wet-on-wet process that cures to create a seamless, monolithic membrane that is permanently elastic, can not delaminate, and adheres to the exact contours of the substrate. To overcome the challenges of applying the waterproofing membrane to the larger, more complex structure of the bear ravine, a quartz aggregate was scattered on to the wet primer to create a key.The membrane was applied using the same methodology with resin, followed by 200g fleece and more resin to fully saturate the reinforcement fleece. Once the waterproofing system to the walkway and staircases of the bear ravine was complete, the contracting team applied a quartz aggregate laid into the coating to create a non-slip surface. The conservation of the Tecton structures at DZG continues, with the remaining structures undergoing a similar programme of scheduled repairs and upgrades over the coming years. Stuart Hicks is marketing manager at Kemper System. The pioneering use of reinforced concrete to create curved forms enabled the architects and engineers to work with the site’s slopes.
RkJQdWJsaXNoZXIy MjgyMjA=